Hammaslahti Copper-Zinc Project
The Hammaslahti Copper-Zinc Project is prospective for volcanogenic massive sulphide mineralisation and contains the historic Hammaslahti mine whose ROM was ±10Mt at an average grade of 1.16% copper, 1.55% zinc, 0.59 g/t gold and 5.2 g/t silver from 1973-86. Drilling has identified previously unknown extensions to the Hammaslahti mine mineralisation with multiple intersections of high-grade massive sulphides. Examples of this extensional mineralisation are 3.4m @ 11.5% copper and 3 ppm silver. Two main target areas have been identified for further exploration.